Government Eases Onshore Wind Power Regulations to Accelerate Renewable Energy Expansion
Simplified Onshore Wind Power Permitting Process
The government has removed the one-year wind measurement data submission requirement for onshore wind power projects, aiming to streamline approval procedures. This change is expected to shorten project preparation timelines and accelerate renewable energy expansion.
A new alternative using publicly available meteorological data from the Korea Meteorological Administration (KMA) will replace the previous requirement. Developers can now proceed with permits based on KMA's open data rather than conducting their own year-long measurements.
Renewable Energy Policy Integration
This measure is part of President Yoon Suk Yeol's administration's broader strategy to establish a foundation for renewable energy transition. The Ministry of Environment recently announced its first Renewable Energy Basic Plan, which includes revising the RPS (Renewable Portfolio Standard) and aiming to increase renewable energy's share to 30%.
A target has also been set to secure over 150GW of renewable energy generation capacity by 2035, with plans to expand solar power to cost levels comparable to nuclear energy. This is considered a crucial step toward declaring South Korea an energy-independent nation.
Reduced Burden for Developers
The removal of the 'one-year wind measurement' requirement has shortened project preparation time by over one year, easing the burden on developers. The new approach using KMA data will particularly benefit small businesses and new entrants in the market.
Previously, developers had to collect on-site wind data for a full year before applying for permits. Now, they can utilize publicly available meteorological information instead, reducing both time and costs.
RPS Abolition Bill Passes Committee
This policy change aligns with the recent passage of the RPS abolition bill in the National Assembly's standing committee. The move is expected to transition to competitive bidding, enhancing market efficiency for renewable energy projects.
State-owned power company Korea Electric Power Corporation (KEPCO) will merge into a single entity called 'Korea Power' next year, while the Ministry of Environment has announced its first Renewable Energy Basic Plan as part of the government's strategy to achieve an energy-independent nation. This demonstrates concrete planning for South Korea's renewable energy expansion.
Increasing Wind Power Deployment Speed Toward 2030 Goals
An analysis suggests that wind power deployment must increase tenfold by 2030 to meet renewable energy targets, highlighting the necessity of accelerating onshore wind development. The shortened project preparation period will play a crucial role in achieving these goals.
The government aims to secure over 150GW of renewable energy capacity by 2035, which represents approximately four times the current generation level.

Frequently Asked Questions
Why was the mandatory one-year wind measurement requirement removed for onshore wind permits?
The requirement was eliminated to shorten project preparation time through an alternative using publicly available data from the Korea Meteorological Administration (KMA).
What is the required speed of wind power deployment to achieve South Korea's 2030 renewable energy goals?
An analysis indicates that wind power deployment must increase tenfold by 2030 to meet renewable energy targets.
When did the RPS abolition bill pass through the National Assembly committee?
The RPS abolition bill passed the National Assembly's standing committee on May 21, 2026.
FAQ
Why was the mandatory one-year wind measurement requirement removed for onshore wind permits?
The requirement was eliminated to shorten project preparation time through an alternative using publicly available data from the Korea Meteorological Administration (KMA).
What is the required speed of wind power deployment to achieve South Korea's 2030 renewable energy goals?
An analysis indicates that wind power deployment must increase tenfold by 2030 to meet renewable energy targets.
When did the RPS abolition bill pass through the National Assembly committee?
The RPS abolition bill passed the National Assembly's standing committee on May 21, 2026.
Korean Source
This article is an English localization of a Korean-language report from BlogScore. Original: 육상풍력 의무 폐지와 함께하는 재생에너지 확대 정책